Energy challenge

Grid congestion

When the electricity grid cannot provide sufficient transport capacity, the route starts with insight into the connection, profiles, flexibility and business priorities.

When is this relevant?

When the grid connection limits growth or change

01

Expansion stalls

Additional machinery, buildings or electrical processes require more capacity than is available.

02

Application on a waiting list

The grid operator cannot immediately provide a new or heavier connection.

03

Feed-in is limited

Local generation cannot be fully exported to the electricity grid at all times.

Business impact

The costs often lie in what cannot proceed

Grid congestion can delay investments, electrification or production growth. The business value of a solution therefore comes not only from energy savings, but also from creating room to make plans feasible.

01

Enable growth

Research shows which processes or expansions can fit within the existing capacity.

02

Limit delays

Scenarios clarify which measures can be implemented sooner and which remain dependent on the grid operator.

03

Invest deliberately

Control, storage and process changes are compared for technical effect, costs and contribution to the business objective.

Part of QontrolInsight

What do we investigate?

There is no single standard solution to grid congestion. The feasible route depends on location, contract, business processes and timing.

  • Connection and transport data and the specific capacity requirement
  • Consumption and generation profiles, peaks and coincidence
  • Flexibility in processes, planning and technical installations
  • Possible use of control, storage, generation and charging infrastructure
  • Contractual or collaborative routes that require further assessment
  • Phasing, dependencies and coordination with the parties involved

Possible building blocks

The solution may consist of several components

The analysis clarifies which technical and organisational options deserve further development.

In depth

First determine where the actual limit lies

A capacity issue may arise in the installation, the connection or transport agreement, or the regional electricity grid. Each cause calls for different measures and different parties.

Diagnosis

Distinguish the connection from grid congestion

The available main fuse, contracted capacity and actual peak load are considered alongside information from the grid operator.

  • Assess consumption and feed-in separately
  • Check existing contract values and applications
  • Model future load, including coincidence
Flexibility

Avoid, shift or limit capacity

Some processes can run sequentially or be scheduled outside peak periods. Other processes are business-critical and need protection.

  • Identify flexible and non-flexible loads
  • Clarify operational consequences for each scenario
  • Define rules and fallback options for automatic control
Technical combination

Several building blocks may be required

Energy control, storage, adjusted charging schedules and local generation can complement one another, provided they are designed for the same profile and capacity limit.

  • Calculate the effect on the relevant peak periods
  • Prevent a battery or charging hub from creating new peaks
  • Phase investments based on urgency and future plans
Contract and cooperation

The grid operator remains decisive for grid capacity

Flexible transport agreements, congestion management or joint solutions depend on location and contract. Availability and conditions must always be assessed using current information.

  • Prepare technical data for discussions
  • Separate the roles of the customer, grid operator and any partners
  • Do not guarantee a solution or additional transport capacity in advance

From analysis to management

How a substantiated capacity route takes shape

We first define the capacity requirement, energy profile and contractual situation. We then compare and implement suitable measures, reassessing the chosen route when grid capacity or business operations change.

  1. QontrolInsightRecord the connection, contract, profiles, growth plan, timing and operational impact, and compare scenarios.
  2. QontrolBuildDevelop the chosen route technically, test dependencies and implement the measures with the parties involved.
  3. QontrolCareMonitor performance and reassess the chosen route when contractual capacity or business operations change.

Your next step

Clarify the bottleneck or implement measures immediately?

We determine what is already known and what analysis, coordination or installation is needed to move forward.